The Energy Independence Bill, introduced on , gives ministers powers over certain supplier charges on electricity exported by vehicle-to-grid or a home battery, and over installer registration of charge points. Those powers need the Bill and secondary legislation. From , many cross-pavement chargers in England no longer need planning permission. The highway authority still decides. Conservation areas should check with the planning authority.

What the Energy Independence Bill does for EV drivers

Two powers in the factsheets matter to EV drivers: charges on exported electricity, and who registers a new charge point with the local network company. Neither is in force. Cross-pavement charging is a separate England planning change, already in effect, and it is not part of the Bill.

Energy Independence Bill measures and the separate cross-pavement planning change
Measure Status Who it affects
Certain charges on re-exported electricity Powers only. Not in force. Households using vehicle-to-grid or a home battery
Installer registration with network operators Powers only. Needs secondary legislation. Installers of charge points, heat pumps, solar PV and domestic batteries
Cross-pavement charging in England Separate planning change, in force from . Not part of the Bill. Drivers without a driveway. The local highway authority still decides.

Powers to remove charges on exported electricity (V2G and home batteries)

The removing-charges factsheet says certain charges are placed on electricity suppliers by the volume they supply, and are typically passed through to consumers. They still apply where the electricity is not used in the home and is exported back to the grid.

The Bill would give the Secretary of State powers to remove certain charges from electricity that is re-exported to the grid, including through battery storage or vehicle-to-grid systems.

Removing charges to unlock energy flexibility. Checked .

That is a power to change the rules later. It does not switch any charge off today, and the factsheet does not name which supplier charges would go.

The figure — read it carefully

The impact assessment says that for households re-exporting electricity using vehicle-to-grid systems alone, the measure could reduce bills and deliver cumulative national household savings of around between . “Could” is in the sentence. The total is national, across those years. It is not a figure for one household.

Home batteries are named in the powers, as a way to re-export. They are not in that savings line. Tariff detail is on home battery without solar.

Installer duty to register with DNOs

A second factsheet would place a duty on installers of distributed energy assets to register each installation with the Distribution Network Operator. The assets named are electric vehicle charge points, heat pumps, solar PV and domestic batteries. The duty would sit on the installer, not on the driver.

The factsheet says less than of these assets are registered with DNOs today. Further details, including enforcement, are left to secondary legislation. Until that legislation is made, there is no new duty in force.

The same page gives an illustrative range only. A one percentage point rise in use of low-voltage network capacity could avoid between and of network investment by . GOV.UK says those values should not be assumed to be fully realised because of this measure.

A separate factsheet, not in force, covers a future smart mandate for battery storage: Energy smart mandate for battery storage.

Nothing changes yet

Secondary legislation is still required. No export charge has been removed because of this Bill, and no new registration duty is in force. The overview is dated .

Today’s charging cost is your tariff. Compare it on UK EV tariffs compared and home vs public charging. VAT is a separate Budget measure, on Budget 2026 home charging. Official overview: Energy Independence Bill overview.

Cross-pavement charging (separate from the Bill)

Cross-pavement charging is a Department for Transport planning change. It is not a clause of the Energy Independence Bill. The GOV.UK guidance on cross-pavement solutions applies to England. This page does not set rules for Scotland, Wales or Northern Ireland.

What changed on

From , England has a new permitted development right for eligible cross-pavement solutions, and the existing rights for domestic charge points were amended. Where the right applies, a planning application is no longer the route. The DfT press release says drivers can save up to on installation, the planning fee that eligible work avoids.

The public highway is a different decision. GOV.UK says it rests with the local highway authority, and that a street’s suitability depends on the guidance.

Gullies and under-pavement cables

The guidance describes two main approaches. Cable channels set into the pavement, often called gullies, house the charging cable while the car charges. The cable comes out when charging finishes. GOV.UK says these are the most common solution. The other is a permanent cable running under the pavement, which follows highway reinstatement standards.

Neither type replaces the highway authority’s decision, and neither is part of the Bill. Hardware choices are on granny charger vs wallbox. Typical install costs are on EV charger installation cost.

Conservation areas and other limits

If you live in a conservation area, check with your local planning authority before you install. GOV.UK says you should check whether planning permission is required. The permitted development right also has other limits. Where they are not met, you can still apply to the local planning authority.

One limit in the guidance: a charge point next to the highway is outside the right if less than 1.5 metres of footway would remain between the charge point and the road. Press note: DfT installation announcement. Rules: Cross-pavement solutions.

Grants still available

With highway authority consent for a cross-pavement solution, GOV.UK says a household can claim of the charge point cost, up to . Who can apply is on the OZEV grant checker.

What to do next

FAQs

Does the Energy Independence Bill change anything for EV drivers yet?

No. It was introduced on . The EV-related measures need the Bill to pass and secondary legislation before anything is removed or required.

Will V2G or home-battery export stop attracting supplier charges?

The Bill gives powers to remove certain charges on electricity that is re-exported through V2G or battery storage. GOV.UK’s impact assessment points to around in cumulative national household savings from V2G alone between . Nothing has been removed yet.

Do I have to register my home charger with the network operator?

The proposed duty is on installers, not drivers. It would cover EV charge points and other distributed assets. Details come in secondary legislation. GOV.UK says fewer than of these assets are registered with DNOs today.

Is cross-pavement charging part of the Bill?

No. From , England’s planning rules separately allow many eligible cross-pavement solutions without a planning application. Your local highway authority still decides whether an installation is allowed on the public highway.

Do conservation-area homes need planning permission for cross-pavement charging?

GOV.UK says if you live in a conservation area you should check with your local planning authority before installing. The permitted development right also has other limits and conditions.